Dear all, <br>I am running REMD simulations in gromacs. Taking advantage of vsites I have set the timestep to 5 fs. In the mdp file I have adjusted the energy and frames to be written every 1000 steps (5 ps). While running the simulations I have also selected the exchange trials to be done every 1000 steps (5 ps). I would like to decrease the number of steps between exchange trials, while storing energy and configurations every 5 ps. Is it ok to do so, or will  I have some problem in the future while trying to analyse the data? <br>

Thanks in advance<br>Cesar<br>